top of page
Search

Accredited Environmental Lab Testing: When to Measure What

Okan Nas
Oct 26
6 min read

Who is this guide for?

This guide explains, for businesses that need measurements during or after the environmental permit process, which parameter is measured in which situation and how to build a measurement schedule. If you run a facility that requires stack emission, wastewater, noise or air quality measurements, handling them as part of a plan rather than one by one reduces both cost and inspection risk.

Rather than the technical detail of the measurements themselves, we focus on the decisions the business has to make: what to measure, when to measure it, what information to give the laboratory and how to follow up the results.

What is an accredited environmental measurement laboratory and which businesses does it concern?

An accredited environmental measurement laboratory is one whose measurement and analysis competence is documented through accreditation to TS EN ISO/IEC 17025 and which holds a competence certificate (yeterlik belgesi) for environmental measurements and analyses from the Çevre, Şehircilik ve İklim Değişikliği Bakanlığı (Ministry of Environment, Urbanisation and Climate Change). Measurement reports used in official procedures must be prepared by laboratories of this kind, for parameters within the scope of their certificate.

This matters particularly for facilities covered by an environmental permit or an environmental permit and licence. Hotels and hospitals with combustion plants, manufacturing sites with boiler rooms, businesses discharging wastewater to a receiving body or to the sewer, marble quarries and mines, asphalt and concrete plants, and food and agricultural processing facilities are typical examples.

Measurement obligations can also arise from commitments made during the ÇED (Environmental Impact Assessment) process. A project that has received a positive ÇED decision must carry out the measurements set out in its monitoring plan during construction and operation.

Which parameter is measured when: a step-by-step measurement plan

Which parameter is measured and when depends on the facility's type of activity, its capacity and the permit it holds; there is no fixed schedule that applies to everyone. The first task is therefore to identify, from the documents, which measurements the business is obliged to carry out.

1. Identify your obligations from the documents

Documents such as the environmental permit, the ÇED decision and monitoring plan, and the discharge permit or sewer connection permit show which measurements are required and how often. The regulations in force define the parameters and limit values; the current texts are available via the Mevzuat Bilgi Sistemi (Turkish Legislation Information System).

2. Separate the types of measurement

Environmental measurements generally fall into a few main groups:

  • Stack emissions: parameters such as dust, carbon monoxide, nitrogen oxides and sulphur dioxide from combustion systems and process stacks.

  • Air quality: dust and particulate matter measurements around the facility, especially for open-air activities that generate dust.

  • Wastewater: pH, chemical oxygen demand (COD), biochemical oxygen demand (BOD), suspended solids, oil and grease, and other sector-specific parameters.

  • Noise: environmental noise and facility-related noise level measurements.

  • Others: measurements such as odour, soil and groundwater, depending on the activity or the monitoring plan.

3. Know what triggers a measurement

The need for measurement does not come only from the periodic schedule. Measurements also arise in the following situations:

  • Before applying for or renewing an environmental permit, for measurements that go into the application file.

  • During the permit period, as periodic measurements at the frequency set out in the permit or the legislation.

  • After changes such as a capacity increase or the addition of a new boiler or process line.

  • When the authorities request measurements following a complaint or an inspection.

  • For measurements foreseen in the ÇED monitoring plan for the construction and operation phases.

4. Time measurements to suit operating conditions

Measurements must be taken while the facility is operating under representative conditions. Measuring a seasonal hotel's boiler during the closed season, or having a wastewater sample taken on a low-production day, can produce results that do not reflect reality.

5. Record the results and update the schedule

When reports arrive, compare the results with the limit values, investigate the cause of any exceedance and enter the next measurement date in the schedule. These records are used directly in inspections and permit renewals.

Information to prepare before measurement: checklist

Before the laboratory's measurement team arrives on site, the business should have the following ready:

  • A valid environmental permit or permit and licence, plus the ÇED decision and monitoring plan if applicable.

  • A stack list: the source connected to each stack, fuel type and thermal capacity.

  • Whether the stacks have sampling ports and a safe working platform.

  • The wastewater flow diagram, sampling point and, if present, operating information for the treatment plant.

  • The parameters stated in the sewer connection permit or discharge permit.

  • A list of noise sources and their operating hours, and the nearest sensitive areas (such as housing or schools).

  • Previous measurement reports and any non-conformities noted in them.

  • Confirmation that the facility will be running close to full capacity on the day of measurement.

  • A check that the laboratory's certificate scope covers the required parameters.

Common mistakes and points to watch

A common mistake is not checking the laboratory's competence scope for the parameters to be measured. An accredited laboratory may not be authorised for every parameter; a report issued for a parameter outside its scope may be of no use in an official procedure.

Another problem is measurement points that are not technically suitable. A stack without a sampling port, a port positioned contrary to the standards, or no safe access to the sampling point can lead to the measurement being postponed or repeated.

Leaving the measurement schedule to one person's memory is also a point where businesses get stuck in practice. When the environmental officer or responsible staff member changes, periodic measurement dates can be missed, so the schedule should be written down and accessible.

Finally, when a limit value exceedance appears, simply filing the report is not enough. The cause of the exceedance (fuel settings, burner maintenance, treatment plant operation and so on) should be identified, corrective action taken and, if necessary, the measurement repeated.

Notes for businesses in Antalya

In Antalya, the seasonal operating pattern is especially important when planning measurements. Hotels, holiday resorts and tourism facilities should schedule boiler, generator and wastewater measurements for periods when the facility is full and operating representatively; measurements squeezed into the closed season may not show the real load.

Agricultural and food processing facilities, such as those doing packing, cold storage or fruit and vegetable processing, should plan wastewater and noise measurements around harvest and peak production periods. In facilities producing marble, minerals and construction materials, dust and air quality measurements come to the fore.

For construction projects in the region, noise and dust measurements arising from the ÇED monitoring plan are a separate item to be followed throughout construction. Planning these measurements together with the construction programme prevents disruption to the work schedule.

The process is much easier to manage when the measurement plan, the permit file and monitoring obligations are handled together; you can find our support on this on our environmental consultancy services page.

Frequently Asked Questions

Can I have emission measurements done by any laboratory?

Measurements used in official procedures must be carried out by an accredited environmental measurement laboratory holding a competence certificate from the Ministry. You should also check that the parameters to be measured fall within the laboratory's certificate scope.

How often are environmental measurements carried out?

Measurement frequency varies with the type of activity, capacity and the permit held. It is set out in the environmental permit, the ÇED monitoring plan and the regulations in force; the business needs to build its own schedule on the basis of these documents.

What happens if a result exceeds the limit value?

First, the cause of the exceedance should be identified and corrective action taken. The measurement should then be repeated and the results recorded; a continuing exceedance can create a risk of administrative sanctions at inspection.

When should a seasonal hotel have its measurements done?

Measurements should be carried out while the facility is operating at representative capacity. Measurements taken in the closed season or at low occupancy may not reflect the real emission and wastewater load.

Talk to us about your measurement plan

Get in touch to find out which measurements your business is required to carry out and to set up your measurement schedule; at Asel Çevre Danışmanlık, we will plan the process with you.

Written by Okan Nas, Environmental Engineer, Asel Çevre Danışmanlık.

 
 
 

header.all-comments


bottom of page